- Telenor Pakistan
- Warid Telecom (Pvt.) Ltd.
- Philips Pakistan
- ShaukatKhanum Memorial Hopital
- Pakistan Intl. Container Terminal (PICT)
- Pakistan Refinery
- Qasim Intl. Container Terminal (QICT)
- Engro Chemicals
- Agha Khan University Hospital (AKUH)
- NESCOM
- Allwin Engineering
- ATS Synthetic
- Habib Bank Limited
- Ayesha Textiles
- Allied Bank Limited
- Siddique Trade Centre
- Faysal Bank Limited
- University of Engineering & Technology (UET)
- Pakistan Telecommunication Ltd. (PTCL)
- National Bank of Pakistan
- Finance Trade Centre (FTC)
- Bank Al Habib Limited
- Shell Pakistan
- Pakistan Army - RePower Project
- Gas & diesel sets providing uninterrupted power at AKUH
- DMC & GCP panels at AKUH
- ATS Synthetic: 3 x 1.5MW gas sets with GCP panels at Siddique trade center
- Siddique Trade Center: A view of long & tortuous air intake & exhaust system
- Public Sector Agency: A view of underground tunnel intake duct & exhaust piping
- Public Sector Agency: View of intake duct openings and heavy duty filtration system for engine aspiration
- Public Sector Agency: View of exhaust pipe passing through intake duct & running parallel to it
- Public Sector Agency: A view of paralleling, synchronizing, load sharing & demand management
- Philips: A view of four compact 315kw each gas generating sets generating sets
- Philips: Another view of Philips gensets with heavy duty filtration system
- PICTL 5MW power plant with paralleling, synchronizing & load sharing panels
- A view of 5MW power plant supplying uninterrupted power to PICTL
- Telenor: ATS system designed & developed by Cummins for 100% automation
- Roof mounted site of Telenor with sound attenuated set, fuel tank, fuel automation system
- Cummins 1MW gas generating sets at UET with heavy duty filtration duty filtration
- Philips: Another view of Philips gensets with heavy duty filtration system